OCM Attachments 17-06-2025 – website (2)
…Emerging urban release area will have limited access to public open space and recreation assets. 1 sports reserve34.1ha open space 17 open space parcels 2 Playgrounds BRIGHTON OPEN SPACE STRATEGY…
…Emerging urban release area will have limited access to public open space and recreation assets. 1 sports reserve34.1ha open space 17 open space parcels 2 Playgrounds BRIGHTON OPEN SPACE STRATEGY…
…(d) the height, bulk and form of existing and proposed buildings; (e) the existing buildings and private open space on the site; (f) sunlight to private open space and windows…
…to: (a) the time and duration of commercial vehicle movements; (b) the number and frequency of commercial vehicle movements; https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/45/open?effectiveForDate=2025-03-26#term-45 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/708/open?effectiveForDate=2025-03-26#term-708 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-03-26#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/708/open?effectiveForDate=2025-03-26#term-708 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-03-26#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/45/open?effectiveForDate=2025-03-26#term-45 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-03-26#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-03-26#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/45/open?effectiveForDate=2025-03-26#term-45 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/38/open?effectiveForDate=2025-03-26#term-38 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/688/open?effectiveForDate=2025-03-26#term-688…
…views, open space and orientation to maintain the area’s visual continuity. It is agreed that the development has been separated from the heritage listed place on site a sufficient distance…
…ascertained. (d) The location of the property service connection and sewer inspection opening (IO). Boundary Trap Area The proposed development is within a boundary trap area and the developer will…
…sizes Single open heritage site Possible open space overlap with larger lots Non-residential development potential Open Space Legend Figure 30: Residential Land Capability 125125 9595 120120 9090 8080 135135 2020…
…land is unsuitable for agriculture due to severe limitations. A wide range of limitations are considered, and the most significant limitation determines the final classification. For example, limitations can be…
…the future vibrancy of the centre, consistent with the objectives identified in the Brighton Activity Centre Strategy. Brighton Open Space Strategy Brighton Council has developed the Brighton Open Space Strategy…
…almost completely open understorey dominated by native grasses. The upper, drier slopes tend to have more bare ground (Plate 1) but also ground cover shrubs such as Pultenaea pedunculata, while…
…CBNQCFMM DSJWF BSJHIUPO�EXH � SAM WALTERS � PLOTTED: ���DFD����� ��:�� PM PRO+ECT NP� SHEET NP� RE7 NP� ADDRESS: CLIENT: �� DZTBSU SUSFFU CMJGUPO BFBDI ���� ��� ��� TBN!CVTIGJSFUBTNBOJB�DPN�BV A�SIZE:SCALE: DATE:…
…https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/252/open?effectiveForDate=2025-02-25#term-252 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/30/section/578?effectiveForDate=2025-02-25#term-394 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/232/open?effectiveForDate=2025-02-25#term-232 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/30/section/578?effectiveForDate=2025-02-25#term-397 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/232/open?effectiveForDate=2025-02-25#term-232 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/38/open?effectiveForDate=2025-02-25#term-38 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/160/open?effectiveForDate=2025-02-25#term-160 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/248/open?effectiveForDate=2025-02-25#term-248 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/248/open?effectiveForDate=2025-02-25#term-248 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/232/open?effectiveForDate=2025-02-25#term-232 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/239/open?effectiveForDate=2025-02-25#term-239 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/30/section/578?effectiveForDate=2025-02-25#term-394 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/232/open?effectiveForDate=2025-02-25#term-232 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/38/open?effectiveForDate=2025-02-25#term-38 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/160/open?effectiveForDate=2025-02-25#term-160 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254…
…to a change in the level of risk; https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/248/open?effectiveForDate=2025-02-25#term-248 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/248/open?effectiveForDate=2025-02-25#term-248 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/232/open?effectiveForDate=2025-02-25#term-232 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/239/open?effectiveForDate=2025-02-25#term-239 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/30/section/578?effectiveForDate=2025-02-25#term-394 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/232/open?effectiveForDate=2025-02-25#term-232 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/38/open?effectiveForDate=2025-02-25#term-38 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/160/open?effectiveForDate=2025-02-25#term-160 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/252/open?effectiveForDate=2025-02-25#term-252 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-02-25#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-02-25#term-686 Planning…
…3mm. OPENINGS TO BE FITTED WITH EMBER GUARDS MADE FROM NON-COMBUSTIBLE MATERIAL WITH A MAXIMUM APERTURE OF 2mm ALL ROOF PENETRATIONS TO BE LOCATED CLEAR OF ALL FRAMING MEMBERS AND…
…14.9 Brighton Open Space Strategy 2025 Attachment: A– Engagement Strategy B – Brighton Open Space Strategy 2025 Author: Manager Planning (J Blackwell) Authorised: Director Development Services (A Woodward) Purpose To…
…Open Space Strategy 2025 Attachment: A– Engagement Strategy B – Brighton Open Space Strategy 2025 Author: Manager Planning (J Blackwell) Authorised: Director Development Services (A Woodward) Purpose To note the…
…For example, failure to adequately assess and mitigate risks related to public safety or environmental concerns can lead to harm to individuals or communities, damaging social cohesion and trust in…
…in the planning scheme. However, Council has powers and responsibilities under Sections 116 and 117 of the Local Government (Buildings and Miscellaneous) Act 1993 in relation to public open space….
…Media Event 8/4 Council Workshop 9/4 STRLUS Steering Committee Meeting 9/4 Meeting with Minister Jane Howlett Ordinary Council Meeting | 15/04/2025 6 11/4 Official Opening of the Kitchen at the…
…https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/43/open?effectiveForDate=2025-04-08#term-43 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/160/open?effectiveForDate=2025-04-08#term-160 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-04-08#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-04-08#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/43/open?effectiveForDate=2025-04-08#term-43 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-04-08#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-04-08#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/160/open?effectiveForDate=2025-04-08#term-160 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/43/open?effectiveForDate=2025-04-08#term-43 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-04-08#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/160/open?effectiveForDate=2025-04-08#term-160 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-04-08#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-04-08#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/686/open?effectiveForDate=2025-04-08#term-686 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/254/open?effectiveForDate=2025-04-08#term-254 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/160/open?effectiveForDate=2025-04-08#term-160 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/43/open?effectiveForDate=2025-04-08#term-43 Ordinary Council Meeting | 15/04/2025 41 Acceptable Solution Performance Criteria A1 No Acceptable…
head Draft Planning Scheme Amendment Land Use Planning and Approvals Act 1993 JAMES DRYBURGH Chief Executive Officer Notice is given pursuant to s40G of the Land Use Planning and Approvals…
….8 2 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 205 B A 35 .0 29 .031 .033…
…with quotes Use iseekplant to find trusted contractors near you today, visit: blog.iseekplant.com.au/byda-isp-get-quotes Book a FREE BYDA Session BOOK NOW BYDA offers free training sessions to suit you and your…
…adopted Infrastructure Contributions Policy that is relevant to the land. https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/1/section/4883?effectiveForDate=2024-12-09#term-635 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/82/open?effectiveForDate=2024-12-09#term-82 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/82/open?effectiveForDate=2024-12-09#term-82 Planning Authority | 01/04/2025 35 BRI-S12.8 Development standards for Subdivision BRI-S12.8.1 Subdivision – Precinct A This clause…
…be appropriate. Validated exposure measurement methods should be applied by a competent person and samples analysed by an accredited laboratory. Examples of sources of recommended exposure measurement methods are given…
…with a device to limit the opening or a suitable screen so a 125mm sphere cannot pass through, and withstand a force of 250N. Except for bedrooms, where the requirement…
…IN TANK OR LID) 5030 1000 1000 OPTIONAL OPENING 750W x 880H 5030 1000 1000 23 60 50 50 75×75 BEVEL 23 60 50 50 OPTIONAL OPENINGS 750W x 880H…
…open space 20 open space parcels 5 Playgrounds BRIGHTON OPEN SPACE STRATEGY | 66. BRIGHTON OPEN SPACE STRATEGY | 67. 7.0 CHALLENGES • There is an oversupply of low-quality open…
…open space and/or cash in lieu contributions will be supported by: a) an assessment of open space facilities in the locality b) an indication as to how the open space…
Brighton Council Bushfire Mitigation Strategy 2025-2035 Version 1.2 March 2025 Brighton Council Bushfire Mitigation Strategy 2025-2035 i Cover photo – Fuel reduction burn within Hobart Fire Management Area, TAS (Fire…
…MRWA STANDARDS NEW SERVICES CONNECT NEW SEWER DRAIN TO EXISTING PROPERTY CONNECTION INSPECTION OPENINING V1:150 H1:300 H-210 SEWER LONG SECTION MMDH MM P L A N N I N G…
…occurred. The Commission recommends that the planning authority prepare and certify a suitable draft amendment under section’s 40D and 40F of the Act respectively. It would then be open for…
…Council will take immediate action when required (for example to ensure public health and safety or to protect the environment) and take firm action against those who act unlawfully when…
…an open, honest and ethical manner, promotes fair and open competition, and seek value for money for Council, whilst supporting measures aimed at controlling the risks of fraud or corruption….
…Authority Comments such a strategic investment by Council responsibility of Council, such as roads, bridges, stormwater, open space and the like. There may be occasions where Council act as an…
…raked joints. As per NCC parts 11.3.7 and 11.3.8, Openable windows greater than 4m above ground level are to be fitted with a device to limit the opening or a…
…25 0. 24 EXISTING BUILDING PREVIOUS APPROVED OPEN BAY MACHIENERY SHED FLOOR AREA PROPOSED ADDITION FLOOR AREA 201.60 sqm CONCRETE SLAB TO FLOOR PROPOSED ADDITION PROPOSED ADDITION PR O PO…
…Old Beach – Planning Submission An open space area will be utilized for camping (no caravans) which have their own bathroom facilities. The accommodation buildings are both located outside of…
…take care when clicking links or opening attachments. SV WHSV EP EP EP IN SV IN 450 Dia EP EP EP TC SW I/O SW I/O SW I/O GMH /…
…upgrades. • Begin implementing the key priorities within Council’s recently updated Open Space Strategy. • Complete the construction of the spine pathway and associated upgrades, including a basketball half-court in…
…vary from existing Rural Residential dwellings, Rural zoned open properties and Baskerville Raceway. The site is an ideal location to provide accommodation on site for seasonal workers for the existing…
…FENCE SD – SLIDING DOOR POS – PRIVATE OPEN SPACE (ALL POS NO STEEPER THAN 1:10) – PROVIDE VISITOR CARPARKING SIGN TO ALL VISITOR CARPARKINGS UNIT 8 – 12 (TYPE…
…to the Brighton Local Provisions Schedule to Amend the BRI – S12.0 Burrows Avenue Specific Area Plan – RZ 2025/03 – Section 40D(b) Report • • https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/1/section/4883?effectiveForDate=2024-12-09#term-635 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/82/open?effectiveForDate=2024-12-09#term-82 https://tpso.planning.tas.gov.au/tpso/external/planning-scheme-viewer/terms/82/open?effectiveForDate=2024-12-09#term-82 https://www.brighton.tas.gov.au/wp-content/uploads/2024/10/Policy-1.7-Infrastructure-Contributions.pdf…
…the municipality which is not used and is zoned as Open Space within the Tasmanian Planning Scheme – Brighton, the General Rate is varied by decreasing the amount of 26.0…
…Planning Authority Meeting 9/5 TasWaste South Board Strategic Alignment Workshop 9/5 Conference call with Department of Infrastructure 12/5 Official Opening of Brighton Town Square 15/5 LGAT GMC Meeting 20/5 Council…
…The front fence is chain wire. One side of the property is access to the open land behind and to the other side is a Telstra Exchange. It is not…
…into a lease of that facility. EOI applcants would be required to respond to evaluation criteria for example: Capability & track record Vision and plan for operation aligning with Councils…
…Development Policy 6.1 Stormwater Quality Control Contributions Policy 6.2 Residential Use in the Agriculture Zone Policy 6.3 Bond Policy Policy 6.5 Landscaping Policy 6.6 Public Open Space Policy 6.15 Temporary…
…reduce availability for other paid bookings. Waiving fees could set a precedent for other community-based groups to request similar concessions. Financial Implications The organisers for Butterflies and Boots are requesting…
…has been recently renovated The building is a single storey dwelling: • Office/meeting spaces (3-4) • Foyer/entry area (2) • Large open Dinning and lounge area • Boardroom • Large…